Most of the time on an inspection is spent finding, isolating and testing circuits. A little preparation before the visit means less tracing, fewer surprises and a smoother day for your staff.
Before the visit
- Find your previous EICR and any electrical certificates issued since then.
- Check that distribution boards are labelled and that circuit charts are inside the board doors.
- Agree an isolation plan: which areas can lose power, and when.
- Tell staff and tenants when circuits will be switched off.
Access on the day
Boards behind stock, in locked cupboards or at height slow everything down. Clear a working space in front of each board, have keys ready for plant rooms and risers, and arrange escorted access in advance for secure areas.
Protect IT and critical equipment
Servers, refrigeration, alarms and medical or lab equipment should be shut down safely or moved to an alternative supply before their circuits are isolated. Your inspector can test those circuits at an agreed time, often early in the morning or after close.
Why it is worth the effort
Good records and clear access reduce time on site, which is the biggest part of the cost. They also make agreed sampling possible on larger, well-documented sites.
Need a commercial EICR on your premises?
Fixed price before we arrive, digital certificate within 24 hours.
