commercialeicrcost.co.uk

GUIDEUpdated for 2026 commercial rates

What does a commercial EICR really cost?

Straight answers, real price ranges by premises type, and a live estimator that shows exactly what drives the number: circuits, boards, out-of-hours working and access. Then get a fixed written quote that your invoice will match.

1 dayquote turnaround
Quick estimate
Live
Floor area400 m²
Weekday price, ex VAT£0≈ 24 circuits · 1 board
Refine circuits, boards & timing belowFull estimator ↓
£

“Your invoice will match your quote.”
Any change is agreed with you first.

The short answer

A commercial EICR costs £149.99 for up to 10 circuits, then £15 for each extra circuit and £129.99 for each extra distribution board. That puts a small shop or office unit at £149.99–£505, a medium office or restaurant at £730–£1,590, and larger warehouses, schools and hotels from about £780 upwards. Out-of-hours testing and missing circuit records add to the price.

  • Small shop / office unit£149.99–£505
  • Medium office · restaurant · pub£730–£1,590
  • Warehouse · industrial unit£780–£2,445
  • School · hotel · large multi-let£1,160–£5,050+
£15/cct
Each circuit after the first 10, which are covered by the £149.99 base price
+45%
Weekend or overnight premium on labour
5 yrs
Maximum interval for offices, shops & hotels (IET GN3)
0.5–5 days
Typical time on site, from small unit to large building
Typical prices

Prices by premises type.

Indicative prices for complete inspections of typical buildings. Switch to out-of-hours to see the evening and weekend price.

Small shop / office unit

≤150 m² · 10–25 circuits
£149.99–£505
ex VAT
Most common

Medium office

400–800 m² · 40–80 circuits
£730–£1,590
ex VAT

Restaurant / pub

40–70 circuits · commercial kitchen
£730–£1,310
ex VAT

Warehouse / industrial

1,000–3,000 m² · three-phase
£780–£2,445
ex VAT

School / education

60–150 circuits · holiday testing
£1,160–£3,030
ex VAT

Hotel (30–60 rooms)

100–250 circuits · phased by floor
£2,020–£5,050
ex VAT

Prices ex VAT. Your building may fall outside these ranges, and your written quote will state circuits, boards and testing window.

Fixed written quotes
Itemised remedial pricing
Weekday or out-of-hours testing
3–5 day report turnaround
Before the visit
✓ Agreed in writing

A price you can put in the budget

Circuits, boards, testing window and extent are stated on the quote, along with the isolation plan, before anything is booked.

£
Fixed written quoteValid for 30 days
On the day
✓ No surprises

Testing that fits around your trading

Board-by-board isolation in the window you choose. If the installation is bigger than quoted, we stop and agree it with you first.

⏱
Weekday, evening or weekendIsolation plan agreed in advance
After the report
✓ You stay in control

Every finding explained, every fix priced

Full schedules of test results, a plain-English summary and an itemised quote for anything coded C1, C2 or FI. You decide what happens next.

✓
Report in 3–5 working daysRemedials quoted line by line
Live estimator

Build your estimate, line by line.

We estimate circuits and boards from your premises type and floor area. Override them if you know the real numbers. Every line of the breakdown shows where the money goes.

Premises type
Circuits auto
Distribution boards auto
≈ 1 board per 24 circuits
Testing window
Circuit charts & records
Three-phase supply+£25 per board
Greater LondonParking & congestion, +£35
Agreed samplingFor large, well-documented sites (60+ circuits, records up to date)
Cost drivers

Six things that move the price.

Two buildings with the same floor area can have very different EICR costs. This is why.

01

Number of circuits

Every final circuit is tested individually for continuity, insulation resistance, earth fault loop impedance and RCD operation. Circuit count is the single biggest driver of time on site.

Impact on price
02

Distribution boards

Each board is opened, inspected and isolated separately. Larger buildings with sub-mains and floor boards take longer than one consumer unit with the same number of circuits.

Impact on price
03

When testing can happen

Circuits must be switched off to test. If you can’t lose power while trading, evening or weekend work adds about 25–45% to labour.

Impact on price
04

Records & labelling

Without accurate circuit charts, every circuit has to be traced before it can be tested. Missing records add about £3 per circuit, and partial records about £1.50.

Impact on price
05

Supply & plant

Three-phase supplies, motor circuits, kitchens, server rooms and plant all need more care and coordination with your facilities team.

Impact on price
06

Location & access

City-centre parking, congestion charges, high-level boards needing access equipment, and escorted access in secure sites all add time.

Impact on price
Save money

Six ways to reduce your EICR cost.

Most of the savings come from preparation. None of these cut corners on safety.

Save up to 30%

Send your last EICR & charts

Up-to-date circuit charts and the previous report mean less tracing, a firmer quote, and possibly agreed sampling on larger sites.

Save the premium

Phase it during the day

Board-by-board isolation during trading hours often avoids weekend rates. Most of the building stays live while one area is tested.

Save a visit

Bundle the tests

Book the EICR, emergency lighting test and PAT testing in one visit to share set-up, travel and isolation time.

Save time on site

Clear access to boards

Boards behind stock, in locked rooms or at height slow everything down. Clear access saves billable hours.

Save on travel

Group your sites

Multi-site and portfolio clients get better rates when nearby sites are scheduled together.

Save on remedials

Fix only what's coded

Only C1, C2 and FI items are required. Get an itemised remedial quote and decide on C3 recommendations separately.

Compare quotes

A complete quote vs a bare-minimum one.

The cheapest quote is often cheap because it leaves things out. Use this to compare like for like.

What the quote states
What we includeComplete quote
Watch forBare-minimum quote
Circuits & boards priced
✓Stated in writing
✕"From £X", scope undefined
Testing extent
✓100%, or sampling % agreed & recorded
✕Unstated sample
Testing window & isolation plan
✓Agreed before booking
✕Decided on the day
Full schedule of test results
✓Every circuit, every board
✕Summary certificate only
Inspector registration
✓Scheme number on the quote
✕Not stated
Remedial pricing
✓Itemised, approved by you first
✕Day rate, open-ended
Invoice vs quote
✓Matches, unless you approve changes
✕Extras added afterwards
Beyond the EICR

Costs to budget for.

An EICR reports the installation’s condition. Fixing what’s found, and related safety tests, are priced separately. These are typical indicative ranges.

↯Common remedial work

Only needed if the report has C1, C2 or FI observations.

  • Replace a breaker with an RCBOPer circuit, adds RCD protection£60–£110
  • Main protective bondingTo gas, water or other services£150–£350
  • Fault-finding (FI items)Per hour, typically 1–3 hours£98.99/hr
  • Update circuit charts & labelsPer board£40–£90
  • Replace a distribution boardThree-phase, commercial£1,200–£3,000

✓Related compliance tests

Often booked in the same visit to save set-up and travel.

  • Emergency lighting testBS 5266, 1–3 lights (+£20 per extra light)£69.99
  • Fire alarm inspectionBS 5839 periodic service£150–£400
  • PAT testingPlug-in equipment, certificate includedFrom £49.99
  • Thermal imaging of boardsInfrared survey under load£250–£600
  • Re-test after remedialsUsually certified per repair insteadIncluded
Cost per year

Spread over the interval, it's a small line item.

IET Guidance Note 3 sets recommended maximum intervals by premises type. Divided over the interval, here’s what a typical EICR costs per year. Bars show the midpoint per year on one shared scale.

Office or shop
Typical £149.99–£1,590
5 years
£30–£318/yr
Restaurant, pub or hotel
Typical £730–£5,050
5 years
£146–£1,010/yr
Warehouse or industrial
Typical £780–£2,445
3 years
£260–£815/yr
Leisure venue or cinema
Typical £730–£3,030
3 years
£243–£1,010/yr
Swimming pool or petrol station
Special locations
1 year
Annual inspection: the full EICR cost each year
Full cost/yr
Worked examples

Three typical jobs, priced line by line.

Three common buildings run through the same pricing model as the live estimator above, so you can see how circuits, boards and timing move the number.

Office · example

Three-floor office

Circuits
64
Boards
4
Window
Saturday
Time on site
≈ 1.5 days
£1,957.44
Estimator price

Weekend testing adds about 45% to labour; up-to-date circuit charts mean no tracing.

Retail · example

Ground-floor shop

Circuits
28
Boards
2
Window
Before opening
Time on site
≈ 5.5 hrs
£687.48
Estimator price

An early start before trading adds about 25% to labour and avoids losing a day.

Industrial · example

Warehouse, 2,000 m²

Circuits
86
Boards
6, three-phase
Window
Phased weekday
Time on site
≈ 2 days
£2,089.94
Estimator price

Phasing board by board during the working day avoids the out-of-hours premium.

Fixed price · No surprises · Fixed price ·
£

The fixed-price promise.

Your written quote states the circuits, boards, testing window and extent. If what we find on the day is bigger than what was quoted, we stop and agree it with you first. No approval, no extra charge.

How it works

From brief to report in four steps.

01

Send your brief

Premises, approximate circuits and boards, trading hours, and your previous EICR if you have it.

5 minutes
02

Fixed written quote

Price, programme and isolation plan, agreed with you or your FM before booking.

Within 1 working day
03

Inspection & testing

Board by board, in agreed windows, with C1 dangers made safe on the day.

½ day to several days
04

Report & remedial quote

Full digital report with schedules, and an itemised quote for anything coded. You decide what happens next.

3–5 working days
FAQ

Commercial EICR cost, answered.

Need a number for your budget?

Tell us the building. We’ll send a fixed written quote within one working day.

Our commercial EICR is £149.99 for up to 10 circuits and one distribution board, including the digital report. Each extra circuit is £15 and each extra board £129.99. A small shop or office unit is typically £149.99–£505, a medium office, restaurant or pub £730–£1,590, and larger warehouses, schools and hotels more, depending on the circuit count. All prices exclude VAT.

Every final circuit is individually tested for continuity, insulation resistance, earth fault loop impedance and RCD operation. Time on site follows the circuit count much more closely than floor area, so per-circuit pricing is fairer and easier to compare.

Evening work typically adds about 25% to labour, and weekend or overnight work about 45%. Phased board-by-board isolation during trading hours can often avoid the premium.

No. All prices on this page are before VAT. Most commercial clients can reclaim VAT, but check your own position.

The Electricity at Work Regulations 1989 require electrical systems to be maintained to prevent danger. Periodic inspection and testing is the accepted way to show that, and insurers, landlords and fire risk assessments routinely ask for a current EICR.

IET Guidance Note 3 recommends maximum intervals: five years for offices, shops, hotels and schools; three years for industrial premises and places of entertainment; one year for special locations such as swimming pools. Your inspector may recommend a shorter interval.

On large, well-documented installations, a representative percentage of circuits can be tested in detail, agreed in advance and recorded as a limitation on the report. It reduces time on site. If defects are found, the sample is extended.

No. The EICR reports the condition of the installation. Remedial work for C1, C2 and FI observations is quoted separately, item by item, after the report.

It depends on the lease. Typically the landlord covers the supply, risers, common parts and shared plant, and the tenant covers the installation within their space. We can test both in one visit with separate reports and invoices.

A small unit can take half a day. Larger buildings take several days, depending on boards, circuits, access and phasing. Your quote includes a programme.

No. Emergency lighting (BS 5266) and fire alarm systems (BS 5839) have their own inspection and certification. We can arrange them in the same visit.

Usually, yes. With the premises type, approximate circuits and boards, and ideally your previous EICR, we can give a fixed written quote. For complex sites, a short survey may be needed first.

Fixed quote

Get a price you can put in the budget.

Send the brief, and mention your last EICR if you have one. We’ll reply within one working day with an itemised fixed quote and programme.

Fixed
Written quote, no surprises
1 day
Quote turnaround
BS 7671
Inspection & testing standard
Out of hours
Evenings & weekends available
Request a fixed quote
Replying today

No obligation. We never share your details.

Scroll to Top